Rod Submits Technical Proposal — Predictive Control at Zero Capital Cost

Event Narrative

'2024-11-21. Findings week 42.pptx' sent 05:30 to Nikhil Muthyala and Zeljko Andrasic (cc Pranshu Joshi, Brijesh Patel). Identifies lack of temperature control as the driver of waste; recommends PID fine-tuning, alternating heat/cool, predictive logic and gradual setpoint changes. This is the 'November 25, 2024 technical proposal' relied on in C-20. Management instead adopted Christian's ~$500K buffer-tank approach over Rod's documented objection ('trust the experts'); that project was not implemented. FIRST LINK in the C-20 systemic pattern.

Supporting Evidence (1)

Original Document
Needs Original File
Verify Status
  • Document Exhibit C-722

    Rod's Nov 25 2024 technical proposal email + '2024-11-21. Findings week 42.pptx' (1.87 MB attachment)